AVR 5427 under
construction in WINNIPEG as she was in JANUARY 2008.
5427
5427 STARTED LIFE IN CALIFORNIA AND TOOK 10
YEARS TO BUILD THERE. SHE WAS ACQUIRED BY THE AVR IN THE FALL OF 2007 WHEN
ONE OF OUR MEMBERS MADE A GENEROUS DONATION AND IT WAS FOUND THAT THE
ORIGINAL BUILDER HAD BECOME ILL AND WOULD NOT BE ABLE TO COMPLETE THE
LOCOMOTIVE. WHEN SHE ARRIVED THE RUNNING GEAR, FRAME, BOILER AND SMOKE BOX
WAS COMPLETE ALONG WITH THE TENDER FRAME AND TRUCKS. THE BOILER JACKET WAS
NOT ASSEMBLED AND THERE WAS NO TENDER BODY OR CAB ALONG WITH ALL THE
PLUMBING.
THE LOCOMOTIVE WAS VERY TIGHT AND THE FIRST WORK WAS TO LOOSEN HER UP
TO NEGOTIATE OUR SMALLER RADIUS CURVES.
VIC BECAME THE MAIN BUILDER ON THE PROJECT WITH HELP FROM OTHER MEMBERS
5427 ON LIFT WITH RALPH. THE LOCOMOTIVE IS
BEING TESTED ON AIR AFTER THE LOOSENING OF THE PILLOW BLOCKS AND
RE-ASSEMBLY. BARRY ADJUSTED THE TIMING AND VIC CONNECTED THE AIR.
RUNNING GEAR
FRONT DETAIL WITH SMOKE BOX COVER OFF.
VIEW THROUGH THE SMOKE BOX
BOILER ON SIDE LOOKING AT TUBES.
BOILER JACKET BEING TEST FIT AFTER VIC WELDED IT
TOGETHER. TYPICAL OF THE PENNSY K4 STYLE OF LOCOMOTIVE.
VIC GRINDING INSIDE THE BOILER JACKET
VIC WITH THE STAINLESS STEEL BOILER DRILLING A
NEW ACCESS HOLE INTO THE BOILER. THE LOCOMOTIVE WAS BUILT AS A PROPANE
BURNER WITH NO WAY OF CHECKING YOUR FIRE. WE FELT THAT THE OPERATOR NEEDS
TO SEE THE CONDITION OF HIS FIRE SO ACCESS WAS MADE. THERE WAS ONLY ONE
ACCESS TO THE MUD RING AND WE WANTED FOUR. OTHER MODIFICATIONS WERE MADE
BEFORE THE BOILER WENT TO A PRESSURE WELDER FOR COMPLETION. THE HYDRO TEST
WAS COMPLETED IN JANUARY 2008 TAKING IT TO 280 PSI.
VIC STARTING ON THE BURNER. ED AND GIL DRILLED
THE HOLES. VIC CUT AND FITTED THE MATERIAL.
MORE TO COME
Page new FEBRUARY 2ND, 2008 by Bill Taylor of Winnipeg since FEB 2ND, 2008